客戶詳情︰

客戶類型︰承包商/中間商

采購產品名稱︰集裝箱

項目地點︰卡塔爾

項目階段︰設計

項目工期︰6個月

項目面積︰1200平米

項目金額︰1859萬(1000萬里亞爾)

項目信息︰

A. Introduction

A concept layout of the container fitness center facility has been developed to indicate the possible layout that will be further developed by the design/build contractor inassociation with an approved Architectural and Engineering consultant appointed by the contractor.

Containers will be procured by the contractor as part of the design-build scope ofworks.

B. Client requirements

The intent is to create a modular fitness facility that is easy to dismantle and move when required. It is to be designed using shipping containers to facilitate easy transport and assembly on site.

1. Each container unit will be shipped in its original form (based on whatever is required to comply with shipping policy) therefore the side walls must be in place whenever they need to be shipped again. So, the side walls will either be either hinged or detachable as and when required.

2. The purpose of the building is a fitness facility, therefore the loads for the floor boards (flooring) must factor the weight of the exercise equipment.

3. All exercise equipment shall be fixed to the floor before shipment and shall remain fixed at all times.

4. The main training level (first floor) can be composed of two containers

vertically stacked on top of each other to achieve the desired height (at

least 4.5 m. refer to drawings).

5. The wet areas and their plumbing will be designed in a manner that will allow them to be detached/locked as and when required.

6. Glazed sections wherever applicable will be fixed before shipment as

well.

7. The swimming pool is an important component of the fitness facility we propose that it is cast in the plinth unless there is a way to use a shipping container or multiple containers to create a swimming pool.

8. All MEP utilities are required to be pre-fixed in a manner that allows them to be attached & locked when put together.

9. The design shown is indicative as it has not been specifically done to

suit the container building and is open to change/adjustments if required.

10. The Elevation shown is also indicative and is the original aesthetic intent

and is open to change.

DESIGN/BUILD BRIEF ?? CONTAINER FITNESS CENTER

DESIGN/BUILD BRIEF ?? CONTAINER FITNESS CENTER 2

11. The external walls of the structure shall be insulated to economize on the HVAC load and all the external glazing shall be double glazed.

C. Scope of Work

The container fitness center structure shall be designed/built by the contractor with pre-qualified approved consultants.

The following shall be included:

? Site and topographic survey

? Site utilities drawings and execution of the work

? Civil works drawings and execution of the work

? Architectural drawings

? Structural design and calculations

? Electrical drawings

? Air/conditioning drawings (mechanical)

? Calculation for structural and electro/mechanical

? The design/build scope shall include for data, lighting and power

distribution within the container

? The infrastructure for sound system shall also be provided

? Design of the air-conditioning system shall be included

? The contractor shall design, supply, construct, test and commission and deliver the project to the owner within the period specified in the request for proposal/contract.

D. Design/Build Schedule

The design/build schedule for the container fitness center facility is estimated as 180 days.

E. Deliverables

Price for delivering different options shall be provided as alternative offers.

The contractor shall employ his consultant to prepare presentation drawings for the review and approval of the owner that shall include the following:

? Survey drawings

? Site/Civil drawings

? Floor plans site plan and roof plan

? Elevations, section and wall section

? Connection dismantling and re-assembling details

? Specifications for Mechanical, Electrical works and finishing materials

? 3D views (at least 3 views) to demonstrate to the owner the design of the facility

DESIGN/BUILD BRIEF ?? CONTAINER FITNESS CENTER

DESIGN/BUILD BRIEF ?? CONTAINER FITNESS CENTER 3

ACAD drawing files for the concept and detailed shall be included.

Project specifications and manuals for maintenance shall be submitted by the contractor after completion of the works.

Shop drawings shall be developed by the contractor and the consultant of the contractor for approval of all elements of the building and site, prior to execution of any work.

The contractor shall develop and hand over to the owner the as-built drawings for the facility after approval by the owner appointed supervision consultant.

The entire facility designed and constructed shall be delivered to the owner within the specified period.

F. Drawings

The concept drawings attached to this brief provide full information about the building listed above for the design / build contractor to price and fully develop the project.

w3.jpg

w4.jpg

w5.jpg

登錄www.jichenghui.com,點擊“采購信息”查看客戶聯系方式

如果您能按要求供應,請在後台留言公司、姓名和聯系方式,方便我們與您對接

購房屋產品  需求裝配式設計  買部品建材

現在就點擊“閱讀原文”

想了解裝配式建築的任何內容,可以隨時留言告訴我們

w6.jpg

               
集装箱之家服务范围:集装箱售楼部,集装箱,集装箱民宿,集装箱展厅,集装箱售楼中心,集装箱别墅,集装箱公寓,集装箱酒店,集装箱客房,集装箱商业,创意集装箱,集装箱健身舱,集装箱便利店,集装箱快闪店等等。电话咨询:400-1363668,微信咨询:17601285773(手机同号)
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

发布主题
阅读排行 更多
广告位
集装箱之家是国内最专业的集装箱建筑门户网站,是专业的规划、设计、制造、施工一体化服务平台(建成产品包括集装箱酒店、集装箱别墅、集装箱商业等)
关注我们
  • App下载

  • 扫描微信二维码

Powered by MyContainers! © 2008-2018 ArchNet Inc.( ICP16011403 )